Validate Cost Centre Structure {FCSO-2}
This option will validate the cost centre structure {FCSO-1} and a report will
be produced. The validation and the items reflected on the resulting
report, are not necessarily errors, but are important to the financial
officer in understanding the unusual consolidations. The items reported
on are as follows:
-
Detail Cost Centres Not Consolidated. Under normal circumstances only
the "top" cost centre should be unconsolidated, and the unconsolidated
ones should be consolidation centres. Any detail cost centre is
supposed to be consolidated, because transactions going through on this
cost centre will not be reported or accumulated.
- Cost Centres Consolidated Into More Than One Consolidation. A cost
centre can be consolidated into more than one structure for reporting
purposes. The user should, however, ensure that the second
consolidation string does not consolidate into the first one, the
reason being that the value of the detail cost centre(s) will be
duplicated.
- Cost Centres Consolidated More Than Once Into A Consolidation. A cost
centre can be consolidated more than once into the same consolidation
structure. This occurrence will result in duplication and possible
imbalances.
- Detail Cost Centres Without Host Cost Centres. A detail cost centre cannot be defined without a host cost centre.
- Control Totals. The report also reflects the following totals:
Total number of cost centres - Total number of consolidation cost
centres - Total number of detail cost centres - Total number of cost
centres not consolidated - Total number of cost centres consolidated
more than once.
User Selection |
Prompt Text
* an item between square brackets [ ] is the default
answer |
Type
&
Length |
Comments |
|
Please enter the financial year (N4) or [ALL] |
YYYY |
This input parameter will affect only the following:
- Detail cost center’s not consolidated.
- Detail cost centre’s consolidating more than once into the top consolidation cost centre’s
- Detail cost centre’s without host cost centre
|
|
Do You Want The Full Validation (Y/N) |
A1 |
|
|
If (Y)es, report will be produced as indicated above. |
|
|
|
If (N)o, program will prompt: Supply Consolidation Cost Centre To Validate. |
A6 |
|
Sort Order |
Per |
Comments |
|
Detail for each Code Structure category.
|
|
System Select |
|
|
No special system selection |
The output of this report consists of the following and each start on new pages:
Cost Centre Statistics.
Number of Active and non-active cost centre’s.
Consolidation cost centre’s at the top of the Consolidation Structure.
Consolidation cost centre’s not used.
Detail cost center’s not consolidated. Influenced by the financial year input parameter.
Consolidation cost centre’s not consolidated.
Detail or Consolidation cost centre’s consolidating more than once into the top consolidation cost centre’s.
Detail cost centre’s consolidating more than once into the top consolidation cost centre’s. Influenced by the financial year input parameter.
Detail cost centre’s without host cost centre. Influenced by the financial year input parameter.
Example:
Processing
Rules |
|
|
No special processing rules |
See Also:
History Of Changes
Date |
System Version |
By Whom |
Job |
Description |
29-May-2008 |
v01.0.0.0 |
Charlene van der Schyff |
t145484 |
New manual format. |
23-Feb-2009 |
v01.0.0.1 |
Ernie van den Berg |
t155140 |
Review the manual. |
23-Mar-2012 |
v02.0.0.0 |
Raymond Schoonraad |
t180643 |
Add input parameter Please Enter Year or ALL |