The processes of production (and to be controlled) are different from institution to institution. Therefore a screen is needed where the users can define their own processes, e.g. typing, editing, typesetting, proofreading, production, etc. This definition is used in options {SDGUIP-1} Material Type and {SDGUIP-3} Master Scheduling.
Field | Type & Length |
Description |
---|---|---|
Process Code | A4 | Enter the process code. |
Process Description | A30 | Enter the process description. |
Sequence | N30 | Enter the sequence number of this process in relation to the other processes defined. Can also be seen as the default production sequence and might be change in option {SDGUIP-1} to suite the material type production. |
Days | N6 | Enter the default number of days normally required for this process. The client is allowed to make the process longer or shorter in option {SDGUIP-3} |
|
Processing Rules |
|
---|---|
No special processing rules |
Date | System Version | By Whom | Job | Description |
---|---|---|---|---|
28-Jan-2007 | v01.0.0.0 | Charlene van der Schyff | t134016 | New manual format. |
25-Sep-2009 | v01.0.0.1 | Ernie van den Berg | t160074 | Review the manual |