System Cycle - Exam Timetable {SEXAM-1}


The System Cycles in respect of examination planning can be controlled via this option. {SCODE2-2}, TAB - Examination Months must be used to link the exam month to the correct exam code and offering types.

Block 1 is not used in this option and should be disregarded.  A query on Block 2 of this option will retrieve the records in respect of Examination Timetable entry (“X”-records).



For further details on this option, see Maintain System Cycles {SMNT-2}.

For a more in detail explanation of the new Application Development Framework (ADF) functionalities refer to the Operational Manual {main-om}.





History of Changes


Date System Version By Whom Job Description
11-Sep-2014v04.0.0.0Magda van der Westhuizent196001Convert manual to INT4.0.