Copy Bundle Claims to Payroll {FPRCPB-4}


This option copies generated bundle claims for weekly paid personnel to the payroll system as Individual Earnings {FPRI-2}


This option may not be executed for payroll calculation numbers and cycles for which the payroll calculation was already done (i.e. a C - Calculation exists in the Event Log File {FPRM-3} for the cycle and calculation number).

If claims need to be copied for calculation numbers and cycles for which payroll calculations were already done, a full salary rollback has to be done first before claims can be copied over.


 
User Selection Prompt Text
* an item between square brackets [ ] is the default answer
Type
&
Length
Comments
1 Copy Claims for (W)eekly. A1  
2 Supply Pay Cycle for which claims must be copied. YYYYWW  
3 Supply the calculation number. N1  
4 Sort Order (A)lphanumeric or (N)umeric. A1  
 N

System Select  
1 Claims generated with Generate Bundle Claims {FPRIM-2} or {FPRCPB-2}  which were not previously copied (i.e. are without a copy date), for personnel who will be paid in the calculation number and cycle.
2 Only Claims that were Authorized in Maintain Bundle Claims {FPRCPB-1}.
3 Canceled Claims are excluded.



History of Changes

Date System Version By Whom Job Description
05-Jan-2007 v01.0.0.0 Frans t138771 Proofread and correction
14-Aug-2009 v01.0.0.1 Charlene van der Schyff t161012 Edit language obtained from proof read language Juliet Gillies.