Bulk Late Rollback {FPRN1-1}

This option is ideal for a bulk late rollback where a general or common  adjustment needs to be applied to the payroll for a large number of personnel.

This option is only used for bulk late rollbacks. Refer to the on-line help for "Rollback Single Calculation" {FPRN-23} for a explanation of the term "Late Rollback".

User Selection Prompt Text
* an item between square brackets [ ] is the default answer
Type
&
Length
Comments
1 Supply Cycle for Rollback of Salary Calculation N6   
2 Rollback of (M)onthly or (W)eekly Payroll Run A1    
3 Salary Calculation Number N1   
4 Enter Start Date Date (DD-MON-YYYY)
Enter End Date  Date (DD-MON-YYYY)


Sort Order Per Comments
1 Personnel Number  


System Select    
1 All records in "Personnel to be Included" {FPRN1-4} with
  • Event "3 - Late Rollback and Recalc Required"
  • Cycle is equal to the cycle for which the bulk late rollback is to be done
  • Date and Time between the Start- and End Date as in the User Selection


Example
:

Example of ...




Processing
Rules
  
Once the Bulk late rollback process is completed successfully, the relevant event "3 - Late Rollback and Recalc Required" records in "Personnel to be Included" {FPRN1-4} will be changed to event "4 - Late Recalc Required".
2 For each personnel member, the processing is exactly the same as when a Single Late Rollback {FPRN-23} has been executed.


See Also:
History Of Changes

Date System Version By Whom Job Description
26-June-2008 v01.0.0.0 Allie de Nysschen t149739 Bulk Late Salary Rollback.