Steps per Person {SSCHRP-5}


This program may be used to indicate the Steps {SSCHRP-3} per Personnel Member and Event {SSCHRP-2} for a Process {SSCHRP-1}.

 

Before this option can be used, the Process {SSCHRP-1}, the Events {SSCHRP-2} and the Steps {SSCHRP-3} for the Process should have been defined

 

Data for this screen can also be automatically generate with the batch program.

 

This screen will restrict the allowed Events {SSCHRP-2} to those linked to the Process {SSCHRP-1} where the Process Code is the same as the value in the Parameter 1 - field of the Menu Instruction {USERS-1} that is used to open the screen.

 
Fields in this option:
 
Block 1:  Events finalized per Student
 
Field Type
&
Length
Description
Event Number N9   
Step A4  
Personnel Number N9  
Ind A1 This indicates whether the Step is for Students (T), a Subject (S) or a Qualification (Q)
Code A7 The Subject or Qualification Code
If the Step is for Students, the Value "STUDNOT" will be populated into the field.
Reporting Period A3  
Due Date DD-MON-YYYY The date that the step should be Finalised may be entered here
Actual Date DD-MON-YYYY The actual date that the activity took place may be entered here.
Finalized Date DD-MON-YYYY This is a display field, that will automatically be populated by the program Steps per Student {SSCHRP-6} when all Steps that is part of the Event for the Personnel Member has a Date Finalized

Example:

Example of ...



See Also:

History of Changes

Date System Version By Whom Job Description
10-Sep-2010 v02.0.0.0 Frans Pelser t161251 New manual