Maintain Checklist Details  {STGRDOP-2}


This option is used to Mantain Check List Details and Item Cost Details.


The user must first define the following rules:

Fields in this option:

Block 1:  Check List Details.

The accuracy of this option will be influenced if detail used here are from records marked as Inactive in the menu options where it gets defined.
If records in related menu options are made inactive after its detail has been used and saved in this option, the data in this option will not be adjusted automatically.

Field Type
&
Length
Description
Event Due Date, will display once the Event No is filled in.
Event No N9 A <LIST OF VALUES> containing valid Event Numbers.
Process Code A10 A <LIST OF VALUES> containing valid Process Codes.
Group Code A10 A <LIST OF VALUES> containing valid Group Codes.
Item Code A4 A <LIST OF VALUES> containing valid Item Codes.  
Item Codes marked as inactive on {STRGDC-3} will not display in the LOV, but inactive codes may be typed in and a warning message will be displayed when the record is saved.
Seq N4 Enter the Sequence of the Activity.
Dep Seq N4 Enter the Dependancy Sequence of the Activity.
Planned Start Date DD-MON-YYYY The Planned Start Date will be calculated according to the days defined for the Item Code on {STGRDC-3}, or it can be entered manually.
Refer to the Processing Rules for calculation rules.
Actual Start Date DD-MON-YYYY Enter the Actual Start Date.
Actual End Date DD-MON-YYYY Enter the Planned Start Date.
Cost Centre A6 A <LIST OF VALUES> containing valid Cost Centre.
Accont Number A8 A <LIST OF VALUES> containing Account Number.
Status A10 <POP-UP> containg Description of Status of the Activity.
Status Update Button This will update the Status.



Processing
Rules


- the Event Due Date is used in the calculation of the Planned Start Date of the first activity.
- the Planned Start Date of the preceding acitivity is used for calculation of a subsequent activity, unless an Actual Start Date exists, in which case it will be used.
- when a Planned- or Actual Start Date is removed, depending activities are not updated.
- if a DepSeq value is removed from a record, the Planned Start Date will be adjusted accordingly when the record is saved.
- if an Inactive Item Code is used in an activity, the Event Due Date will be used as the Planned Start Date i.s.o. being calculated.


Example:

block 1



Block 2:  Item Cost Details

Processing Rules for this Block (delete if not applicable).


Field Type
&
Length
Description
Event No N9 A <LIST OF VALUES> containing valid Event Numbers.
Process Code A10 A <LIST OF VALUES> containing valid Process Codes.
Group Code A10 A <LIST OF VALUES> containing valid Group Codes.
Item Code A4 A <LIST OF VALUES> containing valid Item Codes.
Seq N4 Enter the Sequence of the Activity.
Cost Centre A6 Enter the Cost Centre for this Activity.
Account Number A8 Enter the Account Number for this Activity.
Total Cost N16.2 The Total Cost involved for this Account.
Item Cost N16.2 What is the Cost for this Item.
Details Button This button when pressed will execute the "Cost Centre Details" application.

Example:

block 2




History of Changes

Date System Version By Whom Job Description
12-Nov-2009 v01.0.0.0 Charlene van der Schyff t154559 New manual format.
05-Oct-2010 v01.0.0.0 Brilliant Tleane t154559 Manual Corrections
22-May-2020
v04.1.0.0
Hellen Kgosi
T227631
Added missing information.