Appointment Contract Claims {P00011-1}


This option provides the facilities to submit a Salary Claim against a Secondary Appointment Contract {PAOP-2} and to cancel a claim that has already been submitted but not yet been actioned (i.e. Approved or Rejected).

This process can either by accessed by the Personnel Member of the Secondary Appointment Contract or other Personnel Members that have been authorised to submit a claim on their behalf.  Access is given to other Personnel Members per Personnel Number /Department Code.  Department Codes used are the Primary Departments defined for the Secondary Contract Post Number.  Access may either be defined on Personnel Claim Application Validation Process {PWEBM-15} or by the Personnel Member of the Secondary Appointment Contract “Maintain Employees to Submit Claims”.

 Event  Type “H” in the Run Cycle Control File {FPRM-2} is used to control:

The Contract Period of the Secondary Appointment Contract must fall within the Start and End Date of Event Type “H” in order for the Contract to be displayed (i.e. the Start Date of the Contract must be <= the End Date of Event Type “H” and the End Date of the Contract must be >= the Start Date of Event Type “H”).


The Month /Year of Event Type “H” must be a valid month within the Start and End Dates of Event Type “H”.
The Month /Year controls the current cycle for which a claim may be submitted.
The End Date controls the latest cycle for which a claim may be submitted.
The Payroll Department should set the Month /Year to the current Payroll Cycle.  Once submission of claims for the Month /Year has been closed, it should be set to the following month.

On submission of a claim  SOD 'OS' in GCS2-11 will determine how many months after the actual claim date, may the claim be allowed to be submitted via the iEnabler, this is setup in months.
Each claim has a separate note field which may be populated by the user,

Once a claim has been submitted for approval, the claim is created on the Secondary Appointment Contract {FPRIC-1} page 3 using the month/year for which the Personnel Member submitted the claim, with an ‘Unapproved’ Status.  This is to reserve the funding of the claim and to ensure that the Maximum Amount allocated to the Contract is not exceeded.

On Approval of the claim, the month/year of Event Type “H” is validated to the month/year of the claim:

•    If the month/year of the claim is = month/year of Event Type “H”, the cycle remains as is and the Status is changed from Unapproved to Approved.
•    If the month /year of the claim is < month/year of Event Type “H” but the Contract End Date is => month/year of Event Type “H”, the month/year of the claim is updated to the month/year of Event Type “H” and the Status is updated from Unapproved to Approved.
•    If the month/year of the claim is < month/year of Event Type “H” and the Contract End Date is < month/year of Event Type “H”, the month/year of the claim remains as is and the Status is changed from ‘Unapproved’ to ‘Approved But not Final’.  For cases like this, Payroll   will need to manually update.  Either the Contract End Date will need to be extended to the current Payroll Cycle, the month/year of the claim changed and the status changed from ‘Approved But not Final’ to ‘Approved’.  Or, the Status changed to ‘Approved’ and a Late Calculation done or a Rollback and Re-calculation done.
•    If the month/year of the claim is > month/year of Event Type “H”, the cycle remains as is and the Status is updated from ‘Unapproved’ to ‘Approved’.

Example 1:
When applicant logs onto iEnabler to submit a claim:
Event Type ‘H’:
Start Date = 01-Mar-2015; End Date = 31-Dec-2015; Month /Cycle = 10 2015

On final approval of claim submitted:
Event Type ‘H’:
Start Date = 01-Mar-2015; End Date = 31-Dec-2015; Month /Cycle = 11 2015.

(i)    Secondary Contract Start Date 01-Jan-2015 and End Date 31 Dec-2015

       - Contract will be displayed

      - Claims may be submitted for the following cycles:
        10 2015
        11 2015
        12 2015

    - On Final Approval of request:
     Claim for 10 2015 updated to cycle 11 2015 and Status updated from ‘Unapproved’ to ‘Approved’.
     Claim for 11 2015, cycle remains unchanged and Status updated from ‘Unapproved to ‘Approved’.
     Claim for 12 2015, cycle remains unchanged and Status updated from ‘Unapproved’ to ‘Approved’.

(ii)    Secondary Contract Start Date 01-Jan-20156 and End Date 31-Oct-2015

   -  Contract will be displayed

    - Claim may be submitted for the following cycle:
      10 2015
 
    On Final Approval of request:
Claim for 10 2015; cycle remains unchanged and Status updated from ‘Unapproved’ to ‘Approved but not Final’.  This claim will need to be investigated by Payroll and the applicable action taken.  It will not be included in the copy claims to payroll process when ‘Copy Claims to PRS {FPRIC-3} is run.

(iii)    Secondary Contract Start Date 01-Feb-2015 and End Date 31-Mar-2015

          -  Contract will be displayed

           - Claim may be submitted for the cycle:
             03 2015
 
    
     - On Final Approval of request:
            Claim for 03 2015; cycle remains unchanged and Status updated from ‘Unapproved’ to ‘Approved but not Final’

(iv)    Secondary Contract Start Date 01-Jan-2016 and End Date 31 Dec-2016

           - Contract will not be displayed.

Example 2:

When applicant logs onto iEnabler to submit a claim:
Event Type ‘H’:
Start Date = 01-Oct-2015; End Date = 31-Oct-2015; Month /Cycle = 10 2015

On final approval of claim submitted:
Event Type ‘H’:
Start Date = 01-Nov-2015; End Date = 30-Nov-2015; Month /Cycle = 11 2015


(i)    Secondary Contract Start Date 01-Jan-2015 and End Date 30-Nov-2015

                  -    Contract will be displayed
                  -    Claim may be submitted for the following cycle
                      10 2015
 
                   -  On Final Approval of request:
                   Claim for 10 2015; cycle will be updated to 11 2015 and Status updated from ‘Unapproved’ to ‘Approved’.

(ii)    Secondary Contract Start Date -1=Jan-2015 and End Date 30-Sep-2015

                  - Contract will not be displayed.

(iii)    Secondary Contract Start Date 01-Jan-2015 and End Date 31-Oct-2015

                   - Contract will be displayed.

                   - Claim may be submitted for the following cycle:
                     10 2015
 
                    - On Final Approval of request:
                      Claim for 10 2015; cycle remains unchanged and Status updated from ‘Unapproved’ to ‘Approved but not Final’.

 SOD ‘CF’ ‘Force Claims to be submitted in a Date and Time format {FPRM-9}

This SOD controls the format in which claims will be submitted i.e. Summary (single row per submission) or Detailed with dates and times (1 to 14 rows per submission).

If set to ‘N’o: If set to ‘Y’es: Example:

Submit a claim:



Save the Claim:



Claim Status Updated:




System Select

  

1

The logged-in Personnel Member must select the Personnel Number for whom they want to submit a claim.  The LOV will display all Personnel Members /Departments for whom they are authorised to submit claims {PWEBM-15}.
Personnel Members wanting to submit claims on their own behalf, may either enter their own Personnel Number or simply click on the ‘Continue’ Button.

Secondary Appointment Contracts {PAOP-2} for the logged-in Personnel Member or authorised Personnel Member will be selected as follows:

•    The Contract must be valid during the period defined for Event Type “H” Start and End Date {FPRM-2} (i.e. the End Date of the Contract must be => Start Date of Event Type “H” and the Start date of the Contract must be =< End Date of Event Type “H”)
•    Contract Rate has a value (other than zero)
•    Max Amount Allocated has a value (other than zero)
•    Maximum Quantity is optional
•    The Direct Supervisor (in the Secondary Appointment Contract) has an active Service Record {PBOP-2} on the System Date.
•    If SOD ‘CF’ is set to ‘Y’es, a Claim Type Code {PACS2-14} must be defined for the Contract.

Processing
Rules

 

1 For each Secondary Appointment Contract, the following will be displayed:
  • Post Number
  • Post Description
  • The Secondary Appointment Contract Sequence Number
  • The Primary Department Code defined for the Post Number
  • The Secondary Appointment Contract Start Date
  • The Secondary Appointment Contract End Date
  • Remuneration Unit Description
  • Contract Rate (where applicable)
  • Maximum Quantity /Maximum Amount
  • Claims against the Contract:
  • Pay Cycle of the Claim
  • Value of the Claim (either Quantity or Amount)
  • Claim Status : 
    • Waiting Approval
    • Approved (i.e. has had final approval but not yet copied to payroll)
    • Approved – Payroll to Finalise (i.e. mandatory action is required by Payroll Department in order for the claim to be copied to Payroll)
  • Processed (i.e. copied to Payroll) 
2 Submission of Claims:
  • If Available Amount is greater than zero, a clickable "Submit Claim" - action will be displayed.  This action will open a dialogue that will allow the Personnel Member to submit a new claim for the Secondary Appointment Contract.
  • The cycles displayed for which a claim may be submitted are determined by Event Type ‘H’ within the Start and End Dates of the Secondary Contract Appointment period.
  • Where SOD ‘CF’ is set to ‘Y’es, the rules regarding Dates, Time and Supporting Documentation is determined by the Claim Type Code linked to the Secondary Appointment Contract.  Textual Comments may be added per claim row
  • Where SOD ‘CF’ is set to ‘N’o, there is an added area where the Personnel Member can enter textual comments.  There is also functionality to attach supporting documentation to the claim.  The System Operational Definition {FPRM-9} ‘CW Mandatory for Document to be attached to iEnabler Claim’ is used to determine if it is mandatory or optional.
  • To automatically calculate the hours claimed from the Start- and End Time, a “Remuneration Unit {PACS2-9}” of “H – Per Hour” must be created and used in the “Remuneration Unit” – field of the Secondary Appointment {PAOP-2}.
    • If SOD "RH - Use fractions of hours or whole hours in claims" is set to (N)o, only whole hours will be allowed.
  • On submission of a Claim:
    • A Claim {FPRIC-1} is created with a Status of N- Not Approved, to reserve the funds and prevent overspending on the Contract.
    • The claim is displayed on ‘Appointment Contract Claims’ with a Status ‘Await Approval’ and with an Action ‘Cancel Claim’.  Claims may be cancelled, prior to final Approval.
    • A new Routing Request is created for the Approval of the submitted claim:
  • The Routing Request Type as indicated by System Operational Definition {FPRM-9} parameter "CR - Sec Contract Claims Routing" for Subsystem "PR" will be used.
  • Where SOD ‘CF’ is set to ‘N’o, the Routing Instruction Lines of Sequence 0 of the Routing Request will be populated as follows:
Line Value
1 Date and Time the Claim was Submitted
2 Personnel Number
3 Email Address of the Personnel Member
4 Title, Initials and Surname of the Person
6 The Post, Post Description and Contract Sequence
10 The Payroll Year and Month
11 The Claimed Quantity, Remuneration Units and Contract Rate (If it is a Rate times Quantity type Contract)
12 The Claimed Amount (If it is not a Rate times Quantity type Contract)
15 The Personnel Number of the Direct Supervisor on the Secondary Appointment Contract {PAOP-2}
16 The Email Address of the Direct Supervisor on the Secondary Appointment Contract {PAOP-2}
17 The Title, Initials and Surname of the Direct Supervisor on the Secondary Appointment Contract {PAOP-2}
20 The comments entered when the claim was submitted
30 The authorised person who submitted the claim  of behalf of another person : Employee Number , Initials, Surname
80 The payroll cycle in which the claim will be paid on approval.
100 The individual note for the claim submitted 

  • Where SOD ‘CF’ is set to ‘Y’es, the Routing Instruction Lines of Sequence o of the Routing Request will be populated as follows:
Line Value
1 Date and Time the Claim was Submitted
2 Personnel Number
3 Email Address of the Personnel Member
4 Title, Initials and Surname of the Person
6 The Post, Post Description and Contract Sequence
10 The Payroll Year and Month
11 The Claimed Quantity, Remuneration Units and Contract Rate (If it is a Rate times Quantity type Contract)
15 The Personnel Number of the Direct Supervisor on the Secondary Appointment Contract {PAOP-2}
16 The Email Address of the Direct Supervisor on the Secondary Appointment Contract {PAOP-2}
17 The Title, Initials and Surname of the Direct Supervisor on the Secondary Appointment Contract {PAOP-2}
21 The highest qualification of the personnel member for whom the claim is being submitted
22 The ID Number (or Passport Number where ID Number is not available) of the personnel member for whom the claim is being submitted
23 The Faculty /Department linked to the Secondary Post Number
24 The Claim Type linked to the Secondary Contract
25 The Approval Status of the claim submitted
30 The authorised person who submitted the claim  of behalf of another person : Employee Number , Initials, Surname
50 Row 1 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
51 Row 2 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
52 Row 3 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
53 Row 4 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
54 Row 5 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
55 Row 6 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
56 Row 7 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
57 Row 8 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
58 Row 9 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
59 Row 10 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
60 Row 11 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
61 Row 12 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
62 Row 13 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
63 Row 14 of Claim Submitted: Date and Time worked; Status, Approver, Rejection Reason Description
80 The payroll cycle in which the claim will be paid on approval.
100 The individual note for the claim submitted 
101 The individual note for the second  claim submitted  in row 2  this may continue up to row 14 in line 114

3

Cancellation of Claims:

  • Claims submitted for approval but prior to the claim having been finally approved i.e. with a Claim Status of ‘Await Approval’ may be cancelled.
  • A clickable "Cancel Claim" - action will be displayed.  This action will open a dialogue that displays the Claim details with ‘Remove Claim’ and ‘Return’ buttons.
  • By clicking on the ‘Remove Claim’ button:
    • the Claim will be deleted from {FPRIC-1}
  • Cancel all outstanding (open) steps in the Routing Request {GROU-2} used for the approval of the claim
  • Start the step in the Routing Request to send notification of the cancellation of the claim. The step number is indicated by System Operational Definition {FPRM-9} "CS - Sec Contract Claims Canc Seq" for Subsystem "PR". The step will be started on the original Routing
Document Storage and Retrieval functionality has been linked to this menu to enable the users to upload and view documents related to the claim.

The Document Category {GDOCS-1} which will be used to store documents must be set-up in System Operational Definition {FPRM-9} "CL - Online Claims Document Storage Category" for Subsystem "PR".

See Also: History of Changes

Date System Version By Whom Job Description
27-Jul-2012 v03.0.0.0 Frans Pelser
t178590 New manual.
08-May-2015 v03.0.0.1 Allie de Nysschen t207021 Add Document Storage and Retrieval functionality
27-May-2016 v03.0.0.2 Mmasadi Matseke t214310 Add new fields
01-Jul-2019 v04.1.0.0 Nomhle Lubisi t236816 Added new lines on Sequence 0 for route type 'PACL'
23-Jun-2020 v04.1.0.1 Kerrylee Naidoo t228797 Add Screenprints to manual
10-Dec-2021 V04.1.0.2 Allie de Nysscgen T252864 Ehhance Claims to calculate and display amounts as well as contract numbers.
14 Mar 2022 v04.1.0.4 Allie de Nysschen t254073 Enhance Claims
08-Feb-2024 v04.1.0.5 Frans t264173 Automatic Calculation of hours worked
22-Oct-2024v04.1.0.6Franst269853SOD RH